Project: 50 kW
Hybrid Solar Power Plant for PepsiCo in Kazakhstan

A 50 kW hybrid solar power plant will ensure the autonomy of production facilities, increase energy efficiency and help reduce the company's carbon footprint.

Project Description

Kazakhstan

On the ground

The project involves the installation of a 50 kW hybrid solar power plant at a PepsiCo production or warehouse complex in Kazakhstan. The goal is to provide autonomy to an important part of the enterprise, increase energy efficiency and reduce the carbon footprint of the enterprise.


The system will include highly efficient monocrystalline solar panels, inverter equipment with the ability to operate in hybrid mode, as well as an energy storage system (ESS) based on lithium-ion batteries to ensure uninterruptible power supply in the event of grid outages.

Expected generation is up to 75,000 kWh per year, which will reduce grid consumption by 30–40% and provide backup power for critical facilities. The project payback period is 5–7 years due to savings on electricity and possible government programs to support renewable energy sources.


The project is in line with PepsiCo's environmental goals aimed at sustainable development and reducing environmental impact.

Completed project steps

Шаг 1

Design

Development of a 50 kW hybrid solar power plant project for PepsiCo in Kazakhstan. Taking into account the company's specifications and energy supply requirements.
Шаг 2

Equipment

Procurement of highly efficient monocrystalline solar panels, inverters and energy storage system based on lithium-ion batteries. The equipment is optimized for operation in hybrid mode.
Шаг 3

Construction

Preparation of the site for installation of solar panels and equipment. Carrying out all necessary construction and installation works at the site.
Шаг 4

Installation

Installation of solar panels, inverters and energy storage systems. Connecting the system to the site and setting it up for efficient operation.
Шаг 5

Integration

Integration of solar power plant with PepsiCo power system to ensure autonomy and backup power supply. Testing and optimization of equipment operation.
Шаг 6

Commissioning

Commissioning of the system and ensuring uninterrupted operation. Monitoring of performance and achievement of energy saving targets.