The project involves installing a 600 kW solar power plant on the roof of an industrial or commercial building. The main goal is to reduce electricity costs by using a renewable energy source.
The system will include high-efficiency monocrystalline solar panels and inverters with an efficiency of up to 98%. The generated electricity will cover a significant portion of the facility's needs, reducing dependence on the grid and tariffs.

The expected output is up to 900,000 kWh per year, which will reduce electricity costs by 30-50%. The project payback period is 4-6 years, after which the station will begin to generate net savings.
The project contributes to environmental sustainability by reducing CO₂ emissions and increasing the energy efficiency of the enterprise.

Designing
Equipment
Installation
Connection
Optimization
Commissioning